After showing our audience the first draft of our music video, they filled out a feedback sheet and told us what they liked and what they think needed to change. We have responded to what they said in this PowerPoint presentation. This piece of work has been completed by me.
Monday, 8 December 2014
Saturday, 6 December 2014
Production Schedule
Production Schedule
This is a production schedule that we have put together, it includes information about the dates and locations of filming and also a brief description of how it went and what we managed to get done.
Date: 16th November 2014
Location: Rooftop (Mile End)
Action: Filming
Description: We managed to get a lot of footage for the beginning scenes. The actors looked good on the screen and the quality of the picture was good.
It was hard to get footage of the artist performing as he did not know the words well.
We gave the artist a copy of the lyrics so that hopefully next time he is more comfortable singing into the camera/
Date: 20th-23rd November 2014
Action: Editing
Description: James started a small draft of the first few scenes and was testing out different things we could do. He was experimenting different colour corrections and different editing techniques such as transitions.
Date: 23rd November 2014
Location: Rooftop (Mile End)
Action: Filming
Description: FILMING WAS CANCELLED.
We had to cancel filming because there was really bad weather and it did not stop raining. Because of this we moved this filming day to the next Sunday.
Friday, 5 December 2014
First Draft
This is the first draft that we have put together of our music video. This is the draft that will help us to make our final video better. We will get some peer feedback on this video to see if the audience understand the concept of the video and also to see if they like other things such as costume and location.
Tuesday, 2 December 2014
Beginning Draft
This is a short draft of what we want our video to look like. We have filmed this short verse to see if our ideas actually do look good on the camera. This way we know if we have to change anything before we begin actually filming our official video. This draft acted as a trial run of what we want to do.
Subscribe to:
Posts (Atom)